Cellwood PG50SAMPLE N3 Guía de instalación Pagina 79

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 90
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 78
leaf relief
77
leaf relief
Installing Leaf Relief
®
on Half-Round Gutters
Wrap-Around Fascia Hangers
Lay Leaf Relief
®
on gutter in front
of hanger and mark location of
bracket (see Figure 1).
Notch back of Leaf Relief
®
as
shown in Figure 2.
Firmly press back of Leaf Relief
®
behind gutter, and pivot down to rest
on front lip of gutter (see Figure 3).
Attach with screws through Leaf
Relief
®
and front lip of gutter every
24˝ (Figure 4).
Continue installing Leaf Relief
®
panels, overlapping 1/2˝. As
required, a screw can be inserted
through overlapping panels to reduce
sagging.
Spring Clip Bar Hangers
Lay Leaf Relief
®
on gutter in front
of hanger and mark location of
bracket (see Figure 5).
Cut and notch Leaf Relief
®
as shown
in Figure 6.
Mark
45ϒ
45ϒ
Notch
Every 24"
Mark
Cut
Fig. 1
Fig. 2
Fig. 4
Fig. 5
Fig. 6
Vista de pagina 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 89 90

Comentarios a estos manuales

Sin comentarios